|
|
|
|
|
|
|
4. Detail requirements – fire detection and fire confirmation (system B)
2.4 Test hall and environmental conditions
2.6 System operational conditions
3. Determination of fire suppression and control capabilities
3.6 Test programme and test procedure
4. Determination of area of operation