Resolution MEPC.174(58)
Guidelines for Approval of Ballast Water Management Systems (G8)
Annex. GUIDELINES FOR APPROVAL OF BALLAST WATER
MANAGEMENT SYSTEMS (G8)
5. Typical document requirements for the plan
approval process
6. Approval and certification procedures
8. Installation survey and commissioning procedures
Part 1. Specifications for pre-test evaluation
of system documentation
Part 2. Test and performance specifications
for approval of ballast water management systems
2.1 Quality Assurance and Quality Control Procedures
Part 3. SPECIFICATION FOR ENVIRONMENTAL TESTING
FOR APPROVAL OF BALLAST WATER MANAGEMENT SYSTEMS
Tests for protection against heavy seas
Reliability of electrical and electronic equipment
Part 4. Sample analysis methods for the determination
of biological constituents in ballast water
Sample processing and analysis
Sample analysis for determining efficacy in
meeting the discharge standard
TYPE APPROVAL CERTIFICATE OF BALLAST WATER
MANAGEMENT SYSTEM