Resolution MEPC.125(53)
GUIDELINES FOR APPROVAL OF BALLAST WATER MANAGEMENT SYSTEMS (G8)
Annex. GUIDELINES FOR APPROVAL OF BALLAST WATER MANAGEMENT SYSTEMS (G8)
Ballast Water Management Systems
Ballast Water Treatment Equipment
Control and Monitoring Equipment
5. TYPICAL DOCUMENT REQUIREMENTS FOR THE PLAN APPROVAL PROCESS
6. APPROVAL AND CERTIFICATION PROCEDURES
7. INSTALLATION REQUIREMENTS Sampling facilities
8. INSTALLATION SURVEY AND COMMISSIONING PROCEDURES
PART 1. SPECIFICATIONS FOR PRE-TEST EVALUATION OF SYSTEM DOCUMENTATION
PART 2. TEST AND PERFORMANCE SPECIFICATIONS FOR APPROVAL OF BALLAST WATER
MANAGEMENT SYSTEMS
2.1 Quality Assurance and Quality Control Procedures
Success criteria for shipboard testing
Land-based testing objectives, limitations and criteria for evaluation
Ballast Water Treatment Equipment scaling
Land-based test design - inlet and outlet criteria
Land-based monitoring and sampling
PART 3. SPECIFICATION FOR ENVIRONMENTAL TESTING FOR APPROVAL OF BALLAST WATER
MANAGEMENT SYSTEMS
Tests for protection against heavy seas
Reliability of electrical and electronic equipment
PART 4. SAMPLE ANALYSIS METHODS FOR THE DETERMINATION OF BIOLOGICAL CONSTITUENTS
IN BALLAST WATER
Sample processing and analysis
TYPE APPROVAL CERTIFICATE OF BALLAST WATER MANAGEMENT SYSTEM